Tel+86-22-58503649
Case ShowcasePosition:HOME > Case Showcase
Wenchang Phase III - Merger and Optimization Operation Project
Publication Date:2023-06-21     Read Count:     Font:【Big Moderate Small

Wenchang11619-1B13-2B8-3B platforms' combined capacity optimization and operation project:According to the requirements of the Wenchang Oilfield Group Operation Company, the four platforms mentioned above in Wenchang are to be equipped with crude oil cyclone dehydration and air flotation devices, and at the same time, the supporting structural, equipment, pipeline, electrical and instrument, and safety transformation work is to be carried out. This project applies the company's unique patented technology,***the air flotation skid can be realized without a force pump, and the technical bottleneck of the old air flotation is broken through, which is limited to the flow rate in a smaller range,***the characteristic that the greater the flow rate, the better the dehydration effect, has been achieved, which has made a solid guarantee for the production capacity and marine environmental protection indicators of the oilfield.

 
Prev:Modular sled device
Next:没有了